Ultra-under-excavation control energy-collecting hydraulic smooth blasting construction method for slate tunnel
The invention discloses an ultra-under-excavation control energy-collecting hydraulic smooth blasting construction method for a slate tunnel. The method respectively adopts a slate rock stratum comprehensive geological prediction system, an ANSYS finite element blasting simulation analysis method, s...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses an ultra-under-excavation control energy-collecting hydraulic smooth blasting construction method for a slate tunnel. The method respectively adopts a slate rock stratum comprehensive geological prediction system, an ANSYS finite element blasting simulation analysis method, site construction III, IV and V slate rock surrounding rock blast hole optimization and an electronicdetonator millisecond blasting technology to solve the problems of insufficient contour smoothness, low blast hole retention rate, poor ultra-under-excavation control and large surrounding rock vibration influence of the slate tunnel after blasting. Good effects are obtained in the aspects of section forming and over-under-excavation control by adopting the method. The overbreak is controlled within 10%, the excavation efficiency is improved by about 15%, the explosive consumption is reduced by about 20%, the construction progress is accelerated by about 20%, and the blast hole residual rateis 70%-90%. The method is |
---|