Urban intelligent expressway bent cap wet joint rapid assembly operation platform construction process

The invention discloses an urban intelligent expressway bent cap wet joint rapid assembly operation platform construction process, which comprises two bottom beams, two first top beams, hanging rods which are rotatably mounted on the two sides of the top end of the bottom beam through hinges, and th...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG JIMEI, DAI JINYONG, QUAN YOUWEI, WANG ZHEN, LI FEIFEI, CHEN CHENG, FAN XIAOYE, YANG BAODING
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses an urban intelligent expressway bent cap wet joint rapid assembly operation platform construction process, which comprises two bottom beams, two first top beams, hanging rods which are rotatably mounted on the two sides of the top end of the bottom beam through hinges, and the number of the hanging rods is four; side molds which are fixedly installed on the inner sides of the hanging rods, the number of the side molds is two, and four horizontal pull rods which are fixedly installed at the positions, close to the axis, between the two sets of side molds through nuts; aprotective outer frame, and a steel wire mesh is fixedly mounted outside the protective outer frame. The two second top beams are arranged on the upper portion of the main bearing structure system andsupported on the top faces of the first top beams, the two sides are connected with the four vertical hanging rods to serve as main hanging rods of the structure, the lower ends of the hanging rods are connected with the main