Preparation method of high-temperature alloy semi-closed adapter pipe of dual-layer thin-walled structure

The invention provides a preparation method of a high-temperature alloy semi-closed adapter pipe of a dual-layer thin-walled structure. The preparation method comprises the steps of design of a forming mold, design of a blank, forming of an outer pipe, filling of a core mold, assembly of an inner pi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SHI LIMIN, LI HEPENG, MA XIANGYU, WANG RUI, ZHU DONGMEI, LIU TAIYING, WANG BIN, GAO HAITAO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SHI LIMIN
LI HEPENG
MA XIANGYU
WANG RUI
ZHU DONGMEI
LIU TAIYING
WANG BIN
GAO HAITAO
description The invention provides a preparation method of a high-temperature alloy semi-closed adapter pipe of a dual-layer thin-walled structure. The preparation method comprises the steps of design of a forming mold, design of a blank, forming of an outer pipe, filling of a core mold, assembly of an inner pipe, forming of the inner pipe, cutting away of the process end, heating core mold removal and the like. According to the preparation method, hydraulic forming is adopted, the forming manner is simple, the requirement for mold materials is low, the forming efficiency and forming precision are high, and cost is low; and a low-melting-point alloy is adopted as a semi-closed core mold free of a mold drawing clearance, semi-closed clearance forming is achieved, the core mold is easy to process and convenient to remove, and no residue is generated. The high-temperature alloy adapter pipe prepared through the method adopts the dual-layer structure, is high in rigidity and light and can serve as a high and low temperature
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN110666022A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN110666022A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN110666022A3</originalsourceid><addsrcrecordid>eNqNjEEKwjAURLtxIeodvgcItBW6l1JxJS7cl08zNYG0-SQp0tubggdwNTDz3uwL-wwQDpysn2lCMl6TH8nYt1EJkyBPSwCxc36liMmqwfkITaxZEgKJFWyKXtgpx2uukrGz-mQlYzGFZdgujsVuZBdx-uWhON-6V3tXEN8jCg-Ykfr2UVVl0zRlXV8v_zBfgCZBCg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Preparation method of high-temperature alloy semi-closed adapter pipe of dual-layer thin-walled structure</title><source>esp@cenet</source><creator>SHI LIMIN ; LI HEPENG ; MA XIANGYU ; WANG RUI ; ZHU DONGMEI ; LIU TAIYING ; WANG BIN ; GAO HAITAO</creator><creatorcontrib>SHI LIMIN ; LI HEPENG ; MA XIANGYU ; WANG RUI ; ZHU DONGMEI ; LIU TAIYING ; WANG BIN ; GAO HAITAO</creatorcontrib><description>The invention provides a preparation method of a high-temperature alloy semi-closed adapter pipe of a dual-layer thin-walled structure. The preparation method comprises the steps of design of a forming mold, design of a blank, forming of an outer pipe, filling of a core mold, assembly of an inner pipe, forming of the inner pipe, cutting away of the process end, heating core mold removal and the like. According to the preparation method, hydraulic forming is adopted, the forming manner is simple, the requirement for mold materials is low, the forming efficiency and forming precision are high, and cost is low; and a low-melting-point alloy is adopted as a semi-closed core mold free of a mold drawing clearance, semi-closed clearance forming is achieved, the core mold is easy to process and convenient to remove, and no residue is generated. The high-temperature alloy adapter pipe prepared through the method adopts the dual-layer structure, is high in rigidity and light and can serve as a high and low temperature</description><language>chi ; eng</language><subject>AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKINGWITHOUT ESSENTIALLY REMOVING MATERIAL ; MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES,OTHERWISE THAN BY ROLLING ; MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVINGMATERIAL ; PERFORMING OPERATIONS ; PUNCHING METAL ; TRANSPORTING ; WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS ORPROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200110&amp;DB=EPODOC&amp;CC=CN&amp;NR=110666022A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200110&amp;DB=EPODOC&amp;CC=CN&amp;NR=110666022A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SHI LIMIN</creatorcontrib><creatorcontrib>LI HEPENG</creatorcontrib><creatorcontrib>MA XIANGYU</creatorcontrib><creatorcontrib>WANG RUI</creatorcontrib><creatorcontrib>ZHU DONGMEI</creatorcontrib><creatorcontrib>LIU TAIYING</creatorcontrib><creatorcontrib>WANG BIN</creatorcontrib><creatorcontrib>GAO HAITAO</creatorcontrib><title>Preparation method of high-temperature alloy semi-closed adapter pipe of dual-layer thin-walled structure</title><description>The invention provides a preparation method of a high-temperature alloy semi-closed adapter pipe of a dual-layer thin-walled structure. The preparation method comprises the steps of design of a forming mold, design of a blank, forming of an outer pipe, filling of a core mold, assembly of an inner pipe, forming of the inner pipe, cutting away of the process end, heating core mold removal and the like. According to the preparation method, hydraulic forming is adopted, the forming manner is simple, the requirement for mold materials is low, the forming efficiency and forming precision are high, and cost is low; and a low-melting-point alloy is adopted as a semi-closed core mold free of a mold drawing clearance, semi-closed clearance forming is achieved, the core mold is easy to process and convenient to remove, and no residue is generated. The high-temperature alloy adapter pipe prepared through the method adopts the dual-layer structure, is high in rigidity and light and can serve as a high and low temperature</description><subject>AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKINGWITHOUT ESSENTIALLY REMOVING MATERIAL</subject><subject>MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES,OTHERWISE THAN BY ROLLING</subject><subject>MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVINGMATERIAL</subject><subject>PERFORMING OPERATIONS</subject><subject>PUNCHING METAL</subject><subject>TRANSPORTING</subject><subject>WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS ORPROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjEEKwjAURLtxIeodvgcItBW6l1JxJS7cl08zNYG0-SQp0tubggdwNTDz3uwL-wwQDpysn2lCMl6TH8nYt1EJkyBPSwCxc36liMmqwfkITaxZEgKJFWyKXtgpx2uukrGz-mQlYzGFZdgujsVuZBdx-uWhON-6V3tXEN8jCg-Ykfr2UVVl0zRlXV8v_zBfgCZBCg</recordid><startdate>20200110</startdate><enddate>20200110</enddate><creator>SHI LIMIN</creator><creator>LI HEPENG</creator><creator>MA XIANGYU</creator><creator>WANG RUI</creator><creator>ZHU DONGMEI</creator><creator>LIU TAIYING</creator><creator>WANG BIN</creator><creator>GAO HAITAO</creator><scope>EVB</scope></search><sort><creationdate>20200110</creationdate><title>Preparation method of high-temperature alloy semi-closed adapter pipe of dual-layer thin-walled structure</title><author>SHI LIMIN ; LI HEPENG ; MA XIANGYU ; WANG RUI ; ZHU DONGMEI ; LIU TAIYING ; WANG BIN ; GAO HAITAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN110666022A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2020</creationdate><topic>AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKINGWITHOUT ESSENTIALLY REMOVING MATERIAL</topic><topic>MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES,OTHERWISE THAN BY ROLLING</topic><topic>MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVINGMATERIAL</topic><topic>PERFORMING OPERATIONS</topic><topic>PUNCHING METAL</topic><topic>TRANSPORTING</topic><topic>WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS ORPROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL</topic><toplevel>online_resources</toplevel><creatorcontrib>SHI LIMIN</creatorcontrib><creatorcontrib>LI HEPENG</creatorcontrib><creatorcontrib>MA XIANGYU</creatorcontrib><creatorcontrib>WANG RUI</creatorcontrib><creatorcontrib>ZHU DONGMEI</creatorcontrib><creatorcontrib>LIU TAIYING</creatorcontrib><creatorcontrib>WANG BIN</creatorcontrib><creatorcontrib>GAO HAITAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SHI LIMIN</au><au>LI HEPENG</au><au>MA XIANGYU</au><au>WANG RUI</au><au>ZHU DONGMEI</au><au>LIU TAIYING</au><au>WANG BIN</au><au>GAO HAITAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Preparation method of high-temperature alloy semi-closed adapter pipe of dual-layer thin-walled structure</title><date>2020-01-10</date><risdate>2020</risdate><abstract>The invention provides a preparation method of a high-temperature alloy semi-closed adapter pipe of a dual-layer thin-walled structure. The preparation method comprises the steps of design of a forming mold, design of a blank, forming of an outer pipe, filling of a core mold, assembly of an inner pipe, forming of the inner pipe, cutting away of the process end, heating core mold removal and the like. According to the preparation method, hydraulic forming is adopted, the forming manner is simple, the requirement for mold materials is low, the forming efficiency and forming precision are high, and cost is low; and a low-melting-point alloy is adopted as a semi-closed core mold free of a mold drawing clearance, semi-closed clearance forming is achieved, the core mold is easy to process and convenient to remove, and no residue is generated. The high-temperature alloy adapter pipe prepared through the method adopts the dual-layer structure, is high in rigidity and light and can serve as a high and low temperature</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN110666022A
source esp@cenet
subjects AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKINGWITHOUT ESSENTIALLY REMOVING MATERIAL
MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES,OTHERWISE THAN BY ROLLING
MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVINGMATERIAL
PERFORMING OPERATIONS
PUNCHING METAL
TRANSPORTING
WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS ORPROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL
title Preparation method of high-temperature alloy semi-closed adapter pipe of dual-layer thin-walled structure
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-12T06%3A38%3A20IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SHI%20LIMIN&rft.date=2020-01-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN110666022A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true