Well cementing method for ultra-deep narrow-gap tail pipe with stratum intrusive body
The invention relates to a well cementing method for an ultra-deep narrow-gap tail pipe with a stratum intrusive body. The well cementing method comprises the following steps that (1), the tail pipe is put into a shaft to the to-be-cemented position, and the intrusive body in a well is discharged; (...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to a well cementing method for an ultra-deep narrow-gap tail pipe with a stratum intrusive body. The well cementing method comprises the following steps that (1), the tail pipe is put into a shaft to the to-be-cemented position, and the intrusive body in a well is discharged; (2), well cementing liquid is injected into the well, displacement is conducted in place, and when the well cementing liquid is injected, the construction displacement and the construction pressure are controlled according to a pressure window at the well depth where stratum intrusion occurs; and (3), shutoff-pressure reverse extrusion is conducted. According to the well cementing method for the ultra-deep narrow-gap tail pipe with the stratum intrusive body, the pressure window is judged firstly, balanced-pressure well cementing is conducted under the pressure window to ensure that a stratum is stably pressed, and intrusive body overflowing is reduced; and after mud displacement is finished,the intrusive body which |
---|