Segmented open-stope method without studding and bottom structures

The invention discloses a segmented open-stope method without studding and bottom structures. The segmented open-stope method comprises the steps: ore blocks are divided along the strike of ore bodies, the ore blocks are divided into benches and segments, thick rock covering layers are formed at the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIN SHUAIYU, CHENG CHONGQIANG, LI DUOYONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LIN SHUAIYU
CHENG CHONGQIANG
LI DUOYONG
description The invention discloses a segmented open-stope method without studding and bottom structures. The segmented open-stope method comprises the steps: ore blocks are divided along the strike of ore bodies, the ore blocks are divided into benches and segments, thick rock covering layers are formed at the top ends of the ore blocks before mining, then upward fan-shaped blast holes are constructed in segmented rock drilling roadways, and blasting is conducted through a millisecond short delay; after ore of each segment is broken down, one third of the ore is recovered firstly, the rest of the ore ismassively and uniformly removed at the last segment in a unified mode after all the segments are subjected to ore breaking-down, that is, before massive ore removal, the whole ore blocks are filled with the broken-down ore all the time, the former segment should be ahead of the next segment by the distance of 30 m or above to form bench mining, and after stoping of each segment is completed, segmented rock drilling roadwa
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN110469330A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN110469330A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN110469330A3</originalsourceid><addsrcrecordid>eNrjZHAKTk3PTc0rSU1RyC9IzdMtLgFSCrmpJRn5KQrlmUCqtEShuKQ0JSUzL10hMS9FISm_pCQ_FyhWVJpcUlqUWszDwJqWmFOcyguluRkU3VxDnD10Uwvy41OLCxKTU_NSS-Kd_QwNDUzMLI2NDRyNiVEDAJQQMsg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Segmented open-stope method without studding and bottom structures</title><source>esp@cenet</source><creator>LIN SHUAIYU ; CHENG CHONGQIANG ; LI DUOYONG</creator><creatorcontrib>LIN SHUAIYU ; CHENG CHONGQIANG ; LI DUOYONG</creatorcontrib><description>The invention discloses a segmented open-stope method without studding and bottom structures. The segmented open-stope method comprises the steps: ore blocks are divided along the strike of ore bodies, the ore blocks are divided into benches and segments, thick rock covering layers are formed at the top ends of the ore blocks before mining, then upward fan-shaped blast holes are constructed in segmented rock drilling roadways, and blasting is conducted through a millisecond short delay; after ore of each segment is broken down, one third of the ore is recovered firstly, the rest of the ore ismassively and uniformly removed at the last segment in a unified mode after all the segments are subjected to ore breaking-down, that is, before massive ore removal, the whole ore blocks are filled with the broken-down ore all the time, the former segment should be ahead of the next segment by the distance of 30 m or above to form bench mining, and after stoping of each segment is completed, segmented rock drilling roadwa</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; MINING ; MINING OR QUARRYING</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20191119&amp;DB=EPODOC&amp;CC=CN&amp;NR=110469330A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76418</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20191119&amp;DB=EPODOC&amp;CC=CN&amp;NR=110469330A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LIN SHUAIYU</creatorcontrib><creatorcontrib>CHENG CHONGQIANG</creatorcontrib><creatorcontrib>LI DUOYONG</creatorcontrib><title>Segmented open-stope method without studding and bottom structures</title><description>The invention discloses a segmented open-stope method without studding and bottom structures. The segmented open-stope method comprises the steps: ore blocks are divided along the strike of ore bodies, the ore blocks are divided into benches and segments, thick rock covering layers are formed at the top ends of the ore blocks before mining, then upward fan-shaped blast holes are constructed in segmented rock drilling roadways, and blasting is conducted through a millisecond short delay; after ore of each segment is broken down, one third of the ore is recovered firstly, the rest of the ore ismassively and uniformly removed at the last segment in a unified mode after all the segments are subjected to ore breaking-down, that is, before massive ore removal, the whole ore blocks are filled with the broken-down ore all the time, the former segment should be ahead of the next segment by the distance of 30 m or above to form bench mining, and after stoping of each segment is completed, segmented rock drilling roadwa</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>MINING OR QUARRYING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAKTk3PTc0rSU1RyC9IzdMtLgFSCrmpJRn5KQrlmUCqtEShuKQ0JSUzL10hMS9FISm_pCQ_FyhWVJpcUlqUWszDwJqWmFOcyguluRkU3VxDnD10Uwvy41OLCxKTU_NSS-Kd_QwNDUzMLI2NDRyNiVEDAJQQMsg</recordid><startdate>20191119</startdate><enddate>20191119</enddate><creator>LIN SHUAIYU</creator><creator>CHENG CHONGQIANG</creator><creator>LI DUOYONG</creator><scope>EVB</scope></search><sort><creationdate>20191119</creationdate><title>Segmented open-stope method without studding and bottom structures</title><author>LIN SHUAIYU ; CHENG CHONGQIANG ; LI DUOYONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN110469330A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2019</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>MINING OR QUARRYING</topic><toplevel>online_resources</toplevel><creatorcontrib>LIN SHUAIYU</creatorcontrib><creatorcontrib>CHENG CHONGQIANG</creatorcontrib><creatorcontrib>LI DUOYONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LIN SHUAIYU</au><au>CHENG CHONGQIANG</au><au>LI DUOYONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Segmented open-stope method without studding and bottom structures</title><date>2019-11-19</date><risdate>2019</risdate><abstract>The invention discloses a segmented open-stope method without studding and bottom structures. The segmented open-stope method comprises the steps: ore blocks are divided along the strike of ore bodies, the ore blocks are divided into benches and segments, thick rock covering layers are formed at the top ends of the ore blocks before mining, then upward fan-shaped blast holes are constructed in segmented rock drilling roadways, and blasting is conducted through a millisecond short delay; after ore of each segment is broken down, one third of the ore is recovered firstly, the rest of the ore ismassively and uniformly removed at the last segment in a unified mode after all the segments are subjected to ore breaking-down, that is, before massive ore removal, the whole ore blocks are filled with the broken-down ore all the time, the former segment should be ahead of the next segment by the distance of 30 m or above to form bench mining, and after stoping of each segment is completed, segmented rock drilling roadwa</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN110469330A
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
MINING
MINING OR QUARRYING
title Segmented open-stope method without studding and bottom structures
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-08T09%3A22%3A16IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LIN%20SHUAIYU&rft.date=2019-11-19&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN110469330A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true