Large-span H type steel beam construction technology

The invention belongs to the technical field of building construction, and discloses a large-span H type steel beam construction technology. The large-span H type steel beam hoisting positioning scheme is determined, and the large-span steel structure fulcrum welding technology is determined. A prog...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHENG LONGXIANG, HU XUEHUI, WEI YANPING, YUAN XUTAO, PAN CUNYIN, DOU ANFENG, WU SHENGNAN, LI ZIXIANG, LUO HUIWEI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention belongs to the technical field of building construction, and discloses a large-span H type steel beam construction technology. The large-span H type steel beam hoisting positioning scheme is determined, and the large-span steel structure fulcrum welding technology is determined. A progressive method is adopted for determining the large-span H type steel beam construction technology,and the process is conducted according to the steps from shallow to deep and from simple to complex. Firstly, the H type steel beam structure construction theoretical basis is seriously studied, the arch value of the H type steel beam structure is determined, and data support is provided for the hoisting scheme; and finally, the large-span steel structure fulcrum welding technology is deeply studied, and the large-span H type steel beam construction technology scheme is determined. The large-span H type steel beam construction technology solves the welding deformation problem and avoids residual stress and residual de