Blast furnace distribution material flow proportional valve anticipation and arbitration control method

The invention relates to a blast furnace distribution material flow proportional valve anticipation and arbitration control method. An original database is built according to data measured during blow-in of a blast furnace; an unloading ratio and a quadratic fit polynomial of the material flow propo...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG ZHUAN, YUE ZONGLI, XIA HONGWEI, GAO RUIZHU, LIU BO, LIU XIANPENG, LI RUIGEN, ZHAO YONGHUI, WEI XUEDIAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to a blast furnace distribution material flow proportional valve anticipation and arbitration control method. An original database is built according to data measured during blow-in of a blast furnace; an unloading ratio and a quadratic fit polynomial of the material flow proportional valve openness correspondence are obtained according to the database; during each distributing, the total weight of corresponding material types in charging buckets is calculated, and the unloading ratio is calculated through set distribution time; the unloading ratio is substituted into thequadratic fit polynomial of the material flow proportional valve openness correspondence for anticipation to obtain material flow proportional valve openness value in this distribution; the measuredactual distribution time and the set distribution time are compared for arbitration; and the data of the database is automatically updated to fit out a new unloading ratio and a new quadratic fit polynomial of the material flo