Analysis method for flood control scheduling risk transfer rules of reservoir groups
The invention discloses an analysis method for flood control scheduling risk transfer rules of reservoir groups which comprises the steps of determining a risk element of each reservoir and an uncertainty sequence of each risk element, and obtaining a flood control highest water level sequence corre...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses an analysis method for flood control scheduling risk transfer rules of reservoir groups which comprises the steps of determining a risk element of each reservoir and an uncertainty sequence of each risk element, and obtaining a flood control highest water level sequence corresponding to each uncertainty sequence based on a flood control scheduling model; calculating the information entropy of each uncertainty sequence and the risk entropy of each flood regulation highest water level sequence by adopting an information entropy theory; and based on the information entropyand the risk entropy corresponding to the to-be-analyzed risk element of each reservoir and/or the upstream reservoir thereof, constructing a risk model of the reservoir and analyzing a risk transferrule of each risk element on each reservoir based on the information entropy and the risk entropy corresponding to the risk element of each reservoir and/or the upstream reservoir. By constructing the risk model of the reserv |
---|