DESTINATION DISPATCH SECTORING
A method of operating a building elevator system within a building having a plurality of floors including: controlling a building elevator system comprising a first elevator system having a first elevator car and a second elevator system having a second elevator car; determining one or more sectors...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method of operating a building elevator system within a building having a plurality of floors including: controlling a building elevator system comprising a first elevator system having a first elevator car and a second elevator system having a second elevator car; determining one or more sectors for the plurality of floors in response to at least one of a time of day, manual input, a density ofthe down peak traffic, and whether there is simultaneous up peak or inter-floor traffic, the one or more sectors comprising a first sector having a first plurality of floors and a second sector having a second plurality of floors; assigning the first elevator car to the first sector; and assigning the second elevator car to the second sector.
一种操作具有多个楼层的建筑物内的建筑物电梯系统的方法包括:控制建筑物电梯系统,所述建筑物电梯系统包括具有第一电梯轿厢的第一电梯系统和具有第二电梯轿厢的第二电梯系统;响应于一天中的时间、手动输入、下行峰值流量的密度以及是否存在同时的上行峰值或楼层间流量中的至少一个确定用于所述多个楼层的一个或多个扇区,所述一个或多个扇区包括具有第一多个楼层的第一扇区和具有第二多个楼层的第二扇区;将所述第一电梯轿厢分配给所述第一扇区;且将所述第二电梯轿厢分配给所述第二扇区。 |
---|