Aluminum alloy vertical trim strip inserting construction process

The invention discloses an aluminum alloy vertical trim strip inserting construction process. The aluminum alloy vertical trim strip inserting construction process comprises the following steps: 1, unit plates are flatly stacked to be assembled; 2, aluminum alloy trim strips are inserted into a plat...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG HUA'AN, CHEN WEI, HUANG DEZHEN, JIANG ZHIWEI, LIN HONGGU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses an aluminum alloy vertical trim strip inserting construction process. The aluminum alloy vertical trim strip inserting construction process comprises the following steps: 1, unit plates are flatly stacked to be assembled; 2, aluminum alloy trim strips are inserted into a plate reserved clamp; 3, the unit plates are hoisted in place; 4, stainless steel plug pins are inserted into reserved pin holes; and 5, the upper-layer unit plates and the trim strips are put in place. According to the aluminum alloy vertical trim strip inserting construction process, the aluminum alloy large-section vertical trim strips are designed in a split mode, the rear parts of the trim strips are provided with attached grooves matched with the clamp in specification, the front faces of the trim strips are pressed into the opening-type aluminum alloy clamp where the unit plates stretch out, then the front faces of the trim strips and the opening-type aluminum alloy clamp are firmly connected through stainless s