Sewage pipe network construction resource optimization and progress risk analysis method

The invention discloses a sewage pipe network construction resource optimization and progress risk analysis method. The method comprises the following steps: firstly, establishing mathematical modelsof indirect cost, direct cost and total cost; secondly, establishing constraint conditions; calculati...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LIU LIANGLIANG, YUAN MINGGUO, MA TAO, NAN YUNPENG, LI JIMING, LI XIN, MENG SHUAI, DENG YANBO, ZHU XIANJIE, LUO NING
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a sewage pipe network construction resource optimization and progress risk analysis method. The method comprises the following steps: firstly, establishing mathematical modelsof indirect cost, direct cost and total cost; secondly, establishing constraint conditions; calculating the total cost mathematical model to obtain a team number expression; judging the rationality ofa calculation result, and if the result is reasonable, turning to the next step to obtain an optimal team number; finally, evaluating the influence of external risk factors on construction during operation in different months, and obtaining the actually needed construction period. According to the number of teams, the function relation between the construction period and the cost and the numberof the monthly influence days, the number of the utilization days, the utilization coefficient and the monthly average utilization coefficient, the relation curve between the cost proportion and thenumber of teams, the relation