Ultra-thick bottom plate surveying and setting out construction method and setting out platform
The invention discloses an ultra-thick bottom plate surveying and setting out construction method and a setting out platform, and belongs to the field of construction. The ultra-thick bottom plate surveying and setting out construction method comprises the steps: repeated soil excavation and support...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses an ultra-thick bottom plate surveying and setting out construction method and a setting out platform, and belongs to the field of construction. The ultra-thick bottom plate surveying and setting out construction method comprises the steps: repeated soil excavation and support construction are conducted in a foundation pit; the setting out platform is erected on the lower part of a last support and the upper part of the finished face of a bottom plate; a cushion layer, a waterproof layer and a waterproof protecting layer are constructed, and control points are distributed on the setting out platform; the control points serve as the datum, and an axis net is put onto the waterproof protecting layer; through the put axis net, lower skin steel bars of the bottom plate are constructed; the axis net is put onto the lower skin steel bars; a steel bar supporting frame is completed, and upper skin steel bars are bound; the axis net is put onto the upper skin steel bars;and the axis net on the u |
---|