Construction method of loess tunnel wall-attached portal entering

The invention discloses a construction method of loess tunnel wall-attached portal entering. The construction method comprises the steps that firstly, a full-annular cover arch is constructed througha three-step method; secondly, a soil mass within the range of an upper-step cover arch is excavated;...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG SHUTONG, ZHANG BINGGEN, DUAN YANGYANG, DU QINGXUAN, TIAN LIUZHU, WEI KUIFEI, ZHOU LEI, HE MINGANG, ZHANG FAN, WANG HENG, LI BAOJUN, CHENG XIANGPAN, BAI LIWEI, ZHENG PENG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a construction method of loess tunnel wall-attached portal entering. The construction method comprises the steps that firstly, a full-annular cover arch is constructed througha three-step method; secondly, a soil mass within the range of an upper-step cover arch is excavated; thirdly, a first upper-step arch frame is arranged at the boundary of the upper-step cover arch and the terrain; fourthly, upper-step foot-locking anchor pipes are arranged; fifthly, advanced guide pipes are arranged at the first upper-step arch frame to form a shed frame structure; sixthly, formworks are overhead supported and arranged on the outer side of a mountain; seventhly, concrete is sprayed to manufacture the upper-step cover arch located on the outer side of the mountain; eighthly, excavation is conducted at the first upper-step arch frame in the direction of the inner side of the mountain, the upper-step arch frame is erected, and concrete is sprayed to manufacture the upper-step cover arch located on t