Fabricated steel-concrete composite structure pedestal and pre-tensioning method T beam construction method
The invention discloses a pre-tensioning method T beam construction method for a fabricated steel-concrete composite structure pedestal. The device is provided with an end foundation, a counter-forcesupport, a tensioning cross beam, an anti-pulling foundation, a bending device and a force transmissi...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SUN BING GUO YUE ZHOU QINGCI MOU XINGYONG MING DEJIANG LI DONGSHAN HE LIANGFEI |
description | The invention discloses a pre-tensioning method T beam construction method for a fabricated steel-concrete composite structure pedestal. The device is provided with an end foundation, a counter-forcesupport, a tensioning cross beam, an anti-pulling foundation, a bending device and a force transmission column. Concrete end bases are arranged at the two ends of the pedestal, a prestress tension transmission column is of a reinforced concrete structure, and a tension counter-force beam is machined through profile steel. The force transmission column is designed according to the eccentric pressedcolumn, and the adjacent pedestals in the middle share the force transmission column. The force transmission beam is moved to the underground, so that site occupation and construction are effectivelysaved; a counter-force support system is added, the length of the tensioning cross beam is shortened, a fixed tensioning cross beam is cancelled, and a large-diameter tensioning rod is connected witha movable cross beam to con |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN109676784A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN109676784A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN109676784A3</originalsourceid><addsrcrecordid>eNqNizEOgkAQRWksjHqH8QAkGg1oaYjEyoqeDLtf3Aizm93h_pLIAaz-T9576-xTcxedYYWlpMCQGy8mQkHGj8EnN7-kcTI6RVCARVIeiMVSiMgVkpwXJz2N0Le31FAHHudaftlMF7TNVi8eEnbLbrJ9fW-qR47gW6TABgJtq-fxcC3Korycb6d_nC9Y2UJl</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Fabricated steel-concrete composite structure pedestal and pre-tensioning method T beam construction method</title><source>esp@cenet</source><creator>SUN BING ; GUO YUE ; ZHOU QINGCI ; MOU XINGYONG ; MING DEJIANG ; LI DONGSHAN ; HE LIANGFEI</creator><creatorcontrib>SUN BING ; GUO YUE ; ZHOU QINGCI ; MOU XINGYONG ; MING DEJIANG ; LI DONGSHAN ; HE LIANGFEI</creatorcontrib><description>The invention discloses a pre-tensioning method T beam construction method for a fabricated steel-concrete composite structure pedestal. The device is provided with an end foundation, a counter-forcesupport, a tensioning cross beam, an anti-pulling foundation, a bending device and a force transmission column. Concrete end bases are arranged at the two ends of the pedestal, a prestress tension transmission column is of a reinforced concrete structure, and a tension counter-force beam is machined through profile steel. The force transmission column is designed according to the eccentric pressedcolumn, and the adjacent pedestals in the middle share the force transmission column. The force transmission beam is moved to the underground, so that site occupation and construction are effectivelysaved; a counter-force support system is added, the length of the tensioning cross beam is shortened, a fixed tensioning cross beam is cancelled, and a large-diameter tensioning rod is connected witha movable cross beam to con</description><language>chi ; eng</language><subject>PERFORMING OPERATIONS ; SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER ; TRANSPORTING ; WORKING CEMENT, CLAY, OR STONE</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190426&DB=EPODOC&CC=CN&NR=109676784A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190426&DB=EPODOC&CC=CN&NR=109676784A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SUN BING</creatorcontrib><creatorcontrib>GUO YUE</creatorcontrib><creatorcontrib>ZHOU QINGCI</creatorcontrib><creatorcontrib>MOU XINGYONG</creatorcontrib><creatorcontrib>MING DEJIANG</creatorcontrib><creatorcontrib>LI DONGSHAN</creatorcontrib><creatorcontrib>HE LIANGFEI</creatorcontrib><title>Fabricated steel-concrete composite structure pedestal and pre-tensioning method T beam construction method</title><description>The invention discloses a pre-tensioning method T beam construction method for a fabricated steel-concrete composite structure pedestal. The device is provided with an end foundation, a counter-forcesupport, a tensioning cross beam, an anti-pulling foundation, a bending device and a force transmission column. Concrete end bases are arranged at the two ends of the pedestal, a prestress tension transmission column is of a reinforced concrete structure, and a tension counter-force beam is machined through profile steel. The force transmission column is designed according to the eccentric pressedcolumn, and the adjacent pedestals in the middle share the force transmission column. The force transmission beam is moved to the underground, so that site occupation and construction are effectivelysaved; a counter-force support system is added, the length of the tensioning cross beam is shortened, a fixed tensioning cross beam is cancelled, and a large-diameter tensioning rod is connected witha movable cross beam to con</description><subject>PERFORMING OPERATIONS</subject><subject>SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER</subject><subject>TRANSPORTING</subject><subject>WORKING CEMENT, CLAY, OR STONE</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNizEOgkAQRWksjHqH8QAkGg1oaYjEyoqeDLtf3Aizm93h_pLIAaz-T9576-xTcxedYYWlpMCQGy8mQkHGj8EnN7-kcTI6RVCARVIeiMVSiMgVkpwXJz2N0Le31FAHHudaftlMF7TNVi8eEnbLbrJ9fW-qR47gW6TABgJtq-fxcC3Korycb6d_nC9Y2UJl</recordid><startdate>20190426</startdate><enddate>20190426</enddate><creator>SUN BING</creator><creator>GUO YUE</creator><creator>ZHOU QINGCI</creator><creator>MOU XINGYONG</creator><creator>MING DEJIANG</creator><creator>LI DONGSHAN</creator><creator>HE LIANGFEI</creator><scope>EVB</scope></search><sort><creationdate>20190426</creationdate><title>Fabricated steel-concrete composite structure pedestal and pre-tensioning method T beam construction method</title><author>SUN BING ; GUO YUE ; ZHOU QINGCI ; MOU XINGYONG ; MING DEJIANG ; LI DONGSHAN ; HE LIANGFEI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN109676784A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2019</creationdate><topic>PERFORMING OPERATIONS</topic><topic>SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER</topic><topic>TRANSPORTING</topic><topic>WORKING CEMENT, CLAY, OR STONE</topic><toplevel>online_resources</toplevel><creatorcontrib>SUN BING</creatorcontrib><creatorcontrib>GUO YUE</creatorcontrib><creatorcontrib>ZHOU QINGCI</creatorcontrib><creatorcontrib>MOU XINGYONG</creatorcontrib><creatorcontrib>MING DEJIANG</creatorcontrib><creatorcontrib>LI DONGSHAN</creatorcontrib><creatorcontrib>HE LIANGFEI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SUN BING</au><au>GUO YUE</au><au>ZHOU QINGCI</au><au>MOU XINGYONG</au><au>MING DEJIANG</au><au>LI DONGSHAN</au><au>HE LIANGFEI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Fabricated steel-concrete composite structure pedestal and pre-tensioning method T beam construction method</title><date>2019-04-26</date><risdate>2019</risdate><abstract>The invention discloses a pre-tensioning method T beam construction method for a fabricated steel-concrete composite structure pedestal. The device is provided with an end foundation, a counter-forcesupport, a tensioning cross beam, an anti-pulling foundation, a bending device and a force transmission column. Concrete end bases are arranged at the two ends of the pedestal, a prestress tension transmission column is of a reinforced concrete structure, and a tension counter-force beam is machined through profile steel. The force transmission column is designed according to the eccentric pressedcolumn, and the adjacent pedestals in the middle share the force transmission column. The force transmission beam is moved to the underground, so that site occupation and construction are effectivelysaved; a counter-force support system is added, the length of the tensioning cross beam is shortened, a fixed tensioning cross beam is cancelled, and a large-diameter tensioning rod is connected witha movable cross beam to con</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN109676784A |
source | esp@cenet |
subjects | PERFORMING OPERATIONS SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG, OR MIXTURESCONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER TRANSPORTING WORKING CEMENT, CLAY, OR STONE |
title | Fabricated steel-concrete composite structure pedestal and pre-tensioning method T beam construction method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-29T04%3A23%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SUN%20BING&rft.date=2019-04-26&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN109676784A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |