FUEL PREHEATING SYSTEM FOR COMBUSTION TURBINE ENGINE
The present invention provides a combined cycle power plant (CCPP). The CCPP includes a gas turbine and an HRSG engaged with a steam turbine via a water steam cycle having higher and lower pressure levels. The CCPP further includes a fuel line and fuel preheater. A higher pressure feedwater line del...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The present invention provides a combined cycle power plant (CCPP). The CCPP includes a gas turbine and an HRSG engaged with a steam turbine via a water steam cycle having higher and lower pressure levels. The CCPP further includes a fuel line and fuel preheater. A higher pressure feedwater line delivers higher pressure feedwater to a higher pressure feedwater branch that extends through the fuelpreheater, the high pressure feedwater branch including upstream and downstream segments defined to each side of the fuel preheater. A lower pressure feedwater line delivers lower pressure feedwater to a lower pressure feedwater branch. The downstream segment of the higher pressure feedwater branch is combined with the lower pressure feedwater branch at a junction point and a combined feedwater line extends therefrom. A first heat exchanger exchanges heat between the combined feedwater line and fuel line. A second heat exchanger exchanges heat between the higher pressure feedwater branch and fuel line.
本公开提供种联合循环发电装置( |
---|