Girth cast-in-place process of full-assembly modular low multi-storied buildings
The invention discloses a girth cast-in-place process of full-assembly modular low multi-storied buildings. The process includes the steps: preparing a branch mould base, a wooden formwork, a shapingfixture and a positioning screw; mounting the branch mould base and the wooden formwork; pouring conc...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a girth cast-in-place process of full-assembly modular low multi-storied buildings. The process includes the steps: preparing a branch mould base, a wooden formwork, a shapingfixture and a positioning screw; mounting the branch mould base and the wooden formwork; pouring concrete on the wooden formwork; clamping outside the wooden formwork by the shaping fixture; vibratingthe concrete; inserting the positioning screw into the concrete; performing maintenance; removing a positioning rectangle tube, the shaping fixture, the wooden formwork and the branch mould base. Thegirth cast-in-place process has the advantages high positioning accuracy of the positioning screw and mold strength and the like.
本发明公开了全装配模块化低多层建筑物的围梁现浇工艺,包括以下步骤:准备支模架、木质模板、定型夹具和定位螺杆;在施工地面上安装支模架及木质模板;在木质模板上浇筑混凝土;将定型夹具夹持在木质模板外;对混凝土进行振捣;在混凝土中插入定位螺杆;养护;拆定位矩管、定型夹具、木质模板和支模架。本发明的围梁现浇工艺具有定位螺杆定位精度高、模具强度高等优点。 |
---|