Long span cable-stayed bridge steel box-truss girder line-type control construction method
The invention discloses a long span cable-stayed bridge steel box-truss girder line-type control construction method. The long span cable-stayed bridge steel box-truss girder line-type control construction method comprises the following steps that 1, simulation and prediction analysis on pushing wor...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a long span cable-stayed bridge steel box-truss girder line-type control construction method. The long span cable-stayed bridge steel box-truss girder line-type control construction method comprises the following steps that 1, simulation and prediction analysis on pushing working conditions and support structure stress conditions are conducted through a finite element modelso that a drawing and a mounting procedure can be obtained; 2, segmented components of steel box girders and steel truss girders are manufactured according to the drawing in a factory; 3, the manufactured segments of the steel box girders and the manufactured components of the steel truss girders are transported to a mounting site, hoisted and connected according to the pre-construction drawing and the mounting procedure to form the steel box girders and the steel truss girders; 4, the assembled steel box girders and the assembled steel truss girders are pushed and erected by a walking ejector, and the steel box gird |
---|