Method for strengthening roadbed in place under saturation soft soil geological condition
The invention provides a method for strengthening a roadbed in place under a saturation soft soil geological condition. In the case of determining the position of the roadbed, the composition of softsoil is made clear; according to the composition of the soft soil, a special soft soil curing agent i...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a method for strengthening a roadbed in place under a saturation soft soil geological condition. In the case of determining the position of the roadbed, the composition of softsoil is made clear; according to the composition of the soft soil, a special soft soil curing agent is prepared; the curing agent is blended into the soft soil; and then the soft soil is enabled to stand to change the physical and mechanical property of a roadbed soft soil layer; and therefore, the roadbed soft soil layer satisfies requirements on the road roadbed.
种饱和软土地质条件下路基就地加固方法,就是在确定路基位置情况下,通过对路基处软弱土层取样测试,明确软弱土的组成,根据其组成,配置专用的软弱土固化剂,并将固化剂拌和到软弱土中,然后进行静置,改变路基软弱土层物理力学性质,使其满足作为道路路基的要求。 |
---|