Construction method for forming reclamation land area

The invention discloses a construction method for forming a reclamation land area. The construction method is used for construction in a shallow dike area, and the shallow dike area is divided into afirst hydraulic reclamation area, a second hydraulic reclamation area and a third hydraulic reclamati...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GUO SUMING, JIANG GUIXIANG, BU FANBO, HU KEJIE, ZHANG LUFENG, LI DENGHAI, JIANG XIWEN, LIU TAO, JIANG YI, YE SHUNBO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a construction method for forming a reclamation land area. The construction method is used for construction in a shallow dike area, and the shallow dike area is divided into afirst hydraulic reclamation area, a second hydraulic reclamation area and a third hydraulic reclamation area; a water storage lake is arranged between the first hydraulic reclamation area and the second hydraulic reclamation area; and the third hydraulic reclamation area is closely adjacent to the second hydraulic reclamation area. The construction method for the reclamation land area includes theconstruction stage of hydraulic reclamation of mud for the first hydraulic reclamation area and the water storage lake and the construction stage of hydraulic reclamation of sand for the second hydraulic reclamation area and the third hydraulic reclamation area; the construction stage of hydraulic reclamation of the mud comprises the step that two cutter suction dredgers are selected for cutter suction dredging and mud hy