Production facility for pipe components

In the present invention a soldering area (30), an airtightness testing area (40), and a finishing area (50) are arranged in a row along a first side wall (21) of a single box (20), in the interior ofthe box (20), which is attached to the bed (202) of a trailer (201). In the soldering area (30) work...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SHIGENAGA YUKIO, SHIOTSUKI SATOSHI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In the present invention a soldering area (30), an airtightness testing area (40), and a finishing area (50) are arranged in a row along a first side wall (21) of a single box (20), in the interior ofthe box (20), which is attached to the bed (202) of a trailer (201). In the soldering area (30) work is performed to join multiple members by soldering to produce a partially-finished product. In theairtightness testing area (40) airtightness of the partially-finished product is tested. In the finishing area (50) the partially-finished product is covered with a heat-insulating material, and workis performed to complete a pipe component. Consequently, the work areas for production of pipe components can be arranged suitably in the interior space of a single box, without sacrificing work performance. 在拖车(201)的底盘(202)上所安装的个箱体(20)的内部,使硬钎焊区域(30)、气密性试验区域(40)及完成用区域(50)沿着箱体(20)的第侧壁(21)布置成列。在硬钎焊区域(30)中,进行利用硬钎焊接合多个部件来制作半成品的作业。在气密性试验区域(40)中,进行半成品的气密性试验。在完成用区域(50)中,进行用隔热材料覆盖半成品来完成管道零件的作业。其结果是,能够在无损作业性的情况下,将用以制造管道零件的作业区域适当地布置