Separate construction method of cement stabilized macadam layer

A method for divide joint construction of cement stabilized macadam lay includes cutting joint at low fill road section, arc starting point in road, road fill-excavation junction and road middle line;Tank filling at the joint cut; The splitting construction of cement stabilized macadam layer can be...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHENG HUI, LI XUEHAO, FENG HAIBO, PENG CHANGCHENG, ZHU HUI, YANG JIABANG, XIONG JIANWU, LI WENJIE, ZENG HONGGE, GAO XIANG, SUN LIFENG, SUN XIUDAN, YANG JIN, MA YIMING
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHENG HUI
LI XUEHAO
FENG HAIBO
PENG CHANGCHENG
ZHU HUI
YANG JIABANG
XIONG JIANWU
LI WENJIE
ZENG HONGGE
GAO XIANG
SUN LIFENG
SUN XIUDAN
YANG JIN
MA YIMING
description A method for divide joint construction of cement stabilized macadam lay includes cutting joint at low fill road section, arc starting point in road, road fill-excavation junction and road middle line;Tank filling at the joint cut; The splitting construction of cement stabilized macadam layer can be completed by laying anti-cracking sticker on the upper part of the joints which have been poured. In the process of the invention, a polyester mortar mixture is provided, and the composition comprises polyurethane or polyvinyl chloride mortar, expanded graphite, bentonite or kaolin, fly ash and water. By adopting the technical scheme of the invention, the water-stable layer segmentation construction method is applied, the road surface layer rerepair rate is reduced, and no cracks on the road surface layer are realized during the warranty period. Mainly through the pre-asphalt pavement construction on the water-stable layer of pre-cut joint, the road at the junction of filling and excavation, road arcing point, arc
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN109056484A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN109056484A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN109056484A3</originalsourceid><addsrcrecordid>eNrjZLAPTi1ILEosSVVIzs8rLikqTS7JzM9TyE0tychPUchPU0hOzU3NK1EoLklMyszJrEpNUchNTE5MScxVyEmsTC3iYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GBpYGpmYmFiaOxsSoAQDDzDFO</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Separate construction method of cement stabilized macadam layer</title><source>esp@cenet</source><creator>ZHENG HUI ; LI XUEHAO ; FENG HAIBO ; PENG CHANGCHENG ; ZHU HUI ; YANG JIABANG ; XIONG JIANWU ; LI WENJIE ; ZENG HONGGE ; GAO XIANG ; SUN LIFENG ; SUN XIUDAN ; YANG JIN ; MA YIMING</creator><creatorcontrib>ZHENG HUI ; LI XUEHAO ; FENG HAIBO ; PENG CHANGCHENG ; ZHU HUI ; YANG JIABANG ; XIONG JIANWU ; LI WENJIE ; ZENG HONGGE ; GAO XIANG ; SUN LIFENG ; SUN XIUDAN ; YANG JIN ; MA YIMING</creatorcontrib><description>A method for divide joint construction of cement stabilized macadam lay includes cutting joint at low fill road section, arc starting point in road, road fill-excavation junction and road middle line;Tank filling at the joint cut; The splitting construction of cement stabilized macadam layer can be completed by laying anti-cracking sticker on the upper part of the joints which have been poured. In the process of the invention, a polyester mortar mixture is provided, and the composition comprises polyurethane or polyvinyl chloride mortar, expanded graphite, bentonite or kaolin, fly ash and water. By adopting the technical scheme of the invention, the water-stable layer segmentation construction method is applied, the road surface layer rerepair rate is reduced, and no cracks on the road surface layer are realized during the warranty period. Mainly through the pre-asphalt pavement construction on the water-stable layer of pre-cut joint, the road at the junction of filling and excavation, road arcing point, arc</description><language>chi ; eng</language><subject>ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE ; ADHESIVES ; CHEMISTRY ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; DYES ; FIXED CONSTRUCTIONS ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR ; METALLURGY ; MISCELLANEOUS APPLICATIONS OF MATERIALS ; MISCELLANEOUS COMPOSITIONS ; NATURAL RESINS ; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL ; PAINTS ; POLISHES ; USE OF MATERIALS AS ADHESIVES</subject><creationdate>2018</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20181221&amp;DB=EPODOC&amp;CC=CN&amp;NR=109056484A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20181221&amp;DB=EPODOC&amp;CC=CN&amp;NR=109056484A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHENG HUI</creatorcontrib><creatorcontrib>LI XUEHAO</creatorcontrib><creatorcontrib>FENG HAIBO</creatorcontrib><creatorcontrib>PENG CHANGCHENG</creatorcontrib><creatorcontrib>ZHU HUI</creatorcontrib><creatorcontrib>YANG JIABANG</creatorcontrib><creatorcontrib>XIONG JIANWU</creatorcontrib><creatorcontrib>LI WENJIE</creatorcontrib><creatorcontrib>ZENG HONGGE</creatorcontrib><creatorcontrib>GAO XIANG</creatorcontrib><creatorcontrib>SUN LIFENG</creatorcontrib><creatorcontrib>SUN XIUDAN</creatorcontrib><creatorcontrib>YANG JIN</creatorcontrib><creatorcontrib>MA YIMING</creatorcontrib><title>Separate construction method of cement stabilized macadam layer</title><description>A method for divide joint construction of cement stabilized macadam lay includes cutting joint at low fill road section, arc starting point in road, road fill-excavation junction and road middle line;Tank filling at the joint cut; The splitting construction of cement stabilized macadam layer can be completed by laying anti-cracking sticker on the upper part of the joints which have been poured. In the process of the invention, a polyester mortar mixture is provided, and the composition comprises polyurethane or polyvinyl chloride mortar, expanded graphite, bentonite or kaolin, fly ash and water. By adopting the technical scheme of the invention, the water-stable layer segmentation construction method is applied, the road surface layer rerepair rate is reduced, and no cracks on the road surface layer are realized during the warranty period. Mainly through the pre-asphalt pavement construction on the water-stable layer of pre-cut joint, the road at the junction of filling and excavation, road arcing point, arc</description><subject>ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE</subject><subject>ADHESIVES</subject><subject>CHEMISTRY</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>DYES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><subject>METALLURGY</subject><subject>MISCELLANEOUS APPLICATIONS OF MATERIALS</subject><subject>MISCELLANEOUS COMPOSITIONS</subject><subject>NATURAL RESINS</subject><subject>NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL</subject><subject>PAINTS</subject><subject>POLISHES</subject><subject>USE OF MATERIALS AS ADHESIVES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2018</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAPTi1ILEosSVVIzs8rLikqTS7JzM9TyE0tychPUchPU0hOzU3NK1EoLklMyszJrEpNUchNTE5MScxVyEmsTC3iYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxzn6GBpYGpmYmFiaOxsSoAQDDzDFO</recordid><startdate>20181221</startdate><enddate>20181221</enddate><creator>ZHENG HUI</creator><creator>LI XUEHAO</creator><creator>FENG HAIBO</creator><creator>PENG CHANGCHENG</creator><creator>ZHU HUI</creator><creator>YANG JIABANG</creator><creator>XIONG JIANWU</creator><creator>LI WENJIE</creator><creator>ZENG HONGGE</creator><creator>GAO XIANG</creator><creator>SUN LIFENG</creator><creator>SUN XIUDAN</creator><creator>YANG JIN</creator><creator>MA YIMING</creator><scope>EVB</scope></search><sort><creationdate>20181221</creationdate><title>Separate construction method of cement stabilized macadam layer</title><author>ZHENG HUI ; LI XUEHAO ; FENG HAIBO ; PENG CHANGCHENG ; ZHU HUI ; YANG JIABANG ; XIONG JIANWU ; LI WENJIE ; ZENG HONGGE ; GAO XIANG ; SUN LIFENG ; SUN XIUDAN ; YANG JIN ; MA YIMING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN109056484A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2018</creationdate><topic>ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE</topic><topic>ADHESIVES</topic><topic>CHEMISTRY</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>DYES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><topic>METALLURGY</topic><topic>MISCELLANEOUS APPLICATIONS OF MATERIALS</topic><topic>MISCELLANEOUS COMPOSITIONS</topic><topic>NATURAL RESINS</topic><topic>NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL</topic><topic>PAINTS</topic><topic>POLISHES</topic><topic>USE OF MATERIALS AS ADHESIVES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHENG HUI</creatorcontrib><creatorcontrib>LI XUEHAO</creatorcontrib><creatorcontrib>FENG HAIBO</creatorcontrib><creatorcontrib>PENG CHANGCHENG</creatorcontrib><creatorcontrib>ZHU HUI</creatorcontrib><creatorcontrib>YANG JIABANG</creatorcontrib><creatorcontrib>XIONG JIANWU</creatorcontrib><creatorcontrib>LI WENJIE</creatorcontrib><creatorcontrib>ZENG HONGGE</creatorcontrib><creatorcontrib>GAO XIANG</creatorcontrib><creatorcontrib>SUN LIFENG</creatorcontrib><creatorcontrib>SUN XIUDAN</creatorcontrib><creatorcontrib>YANG JIN</creatorcontrib><creatorcontrib>MA YIMING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHENG HUI</au><au>LI XUEHAO</au><au>FENG HAIBO</au><au>PENG CHANGCHENG</au><au>ZHU HUI</au><au>YANG JIABANG</au><au>XIONG JIANWU</au><au>LI WENJIE</au><au>ZENG HONGGE</au><au>GAO XIANG</au><au>SUN LIFENG</au><au>SUN XIUDAN</au><au>YANG JIN</au><au>MA YIMING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Separate construction method of cement stabilized macadam layer</title><date>2018-12-21</date><risdate>2018</risdate><abstract>A method for divide joint construction of cement stabilized macadam lay includes cutting joint at low fill road section, arc starting point in road, road fill-excavation junction and road middle line;Tank filling at the joint cut; The splitting construction of cement stabilized macadam layer can be completed by laying anti-cracking sticker on the upper part of the joints which have been poured. In the process of the invention, a polyester mortar mixture is provided, and the composition comprises polyurethane or polyvinyl chloride mortar, expanded graphite, bentonite or kaolin, fly ash and water. By adopting the technical scheme of the invention, the water-stable layer segmentation construction method is applied, the road surface layer rerepair rate is reduced, and no cracks on the road surface layer are realized during the warranty period. Mainly through the pre-asphalt pavement construction on the water-stable layer of pre-cut joint, the road at the junction of filling and excavation, road arcing point, arc</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN109056484A
source esp@cenet
subjects ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE
ADHESIVES
CHEMISTRY
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE
DYES
FIXED CONSTRUCTIONS
MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
METALLURGY
MISCELLANEOUS APPLICATIONS OF MATERIALS
MISCELLANEOUS COMPOSITIONS
NATURAL RESINS
NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL
PAINTS
POLISHES
USE OF MATERIALS AS ADHESIVES
title Separate construction method of cement stabilized macadam layer
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-12T00%3A17%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHENG%20HUI&rft.date=2018-12-21&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN109056484A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true