Separate construction method of cement stabilized macadam layer

A method for divide joint construction of cement stabilized macadam lay includes cutting joint at low fill road section, arc starting point in road, road fill-excavation junction and road middle line;Tank filling at the joint cut; The splitting construction of cement stabilized macadam layer can be...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHENG HUI, LI XUEHAO, FENG HAIBO, PENG CHANGCHENG, ZHU HUI, YANG JIABANG, XIONG JIANWU, LI WENJIE, ZENG HONGGE, GAO XIANG, SUN LIFENG, SUN XIUDAN, YANG JIN, MA YIMING
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A method for divide joint construction of cement stabilized macadam lay includes cutting joint at low fill road section, arc starting point in road, road fill-excavation junction and road middle line;Tank filling at the joint cut; The splitting construction of cement stabilized macadam layer can be completed by laying anti-cracking sticker on the upper part of the joints which have been poured. In the process of the invention, a polyester mortar mixture is provided, and the composition comprises polyurethane or polyvinyl chloride mortar, expanded graphite, bentonite or kaolin, fly ash and water. By adopting the technical scheme of the invention, the water-stable layer segmentation construction method is applied, the road surface layer rerepair rate is reduced, and no cracks on the road surface layer are realized during the warranty period. Mainly through the pre-asphalt pavement construction on the water-stable layer of pre-cut joint, the road at the junction of filling and excavation, road arcing point, arc