Integral steel platform formwork hanging adjusting device and method for curved core cylinder construction
The invention discloses an integral steel platform formwork hanging adjusting device and method for curved core cylinder construction, and relates to the technical field of super high-rise building construction equipment. The integral steel platform formwork hanging adjusting device comprises at lea...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses an integral steel platform formwork hanging adjusting device and method for curved core cylinder construction, and relates to the technical field of super high-rise building construction equipment. The integral steel platform formwork hanging adjusting device comprises at least three bidirectional deviation correction and adjustment assemblies which are arranged on at leastthree uniformly arranged longitudinal structure columns close to a formwork of the inner wall of a core cylinder shear wall. Each deviation correction and adjustment assembly comprises two first clamping hoops which are arranged outside the corresponding longitudinal structure column in a sleeving mode at intervals, a second clamping hoop which is arranged outside a horizontal connecting rod vertically and fixedly connected with the corresponding longitudinal structure column in a sleeving mode, connecting pieces which comprise two parallel transverse rods and a longitudinal rod perpendicularto the transverse rods, w |
---|