Single-side high-slop shallow-digging weak-protection dynamic construction method
The invention provides a single-side high-slop shallow-digging weak-protection dynamic construction method, which comprises the following steps including a reconnaissance step, a foundation pit slopedigging step (performing layering digging on the foundation pit digging according to a construction d...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a single-side high-slop shallow-digging weak-protection dynamic construction method, which comprises the following steps including a reconnaissance step, a foundation pit slopedigging step (performing layering digging on the foundation pit digging according to a construction drawing), a monitoring step (building communication on a monitoring platform and a remote monitoringplatform to form a monitoring system; setting a reduced observation point and a reference point on platforms on the slope top of the foundation pit and between the slopes; building an initial readingvalue for a deformation observation point during the observation, starting the implementation after the deformation observation foundation pit digging; obtaining the first state parameter of the current layer slope by the monitoring platform; judging the slope state; when the condition that the slope surface generates displacement is judged, sending warning to the remote monitoring platform), anda slope displacement proces |
---|