Construction method of door opening arc section capping in large-span portal type high pier
The invention discloses a construction method of door opening arc section capping in a large-span portal type high pier, and relates to a construction method, in particular to the construction methodof the door opening arc section capping in the large-span portal high pier. The defects that are exis...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a construction method of door opening arc section capping in a large-span portal type high pier, and relates to a construction method, in particular to the construction methodof the door opening arc section capping in the large-span portal high pier. The defects that are existed in an traditional construction method of the door opening arc section capping in the large-spanportal high pier, such as the construction technology is complex, the precision is not easy to be controlled, the steel consumption is large, the dependence on large hoisting equipment is strong, andthe occupied effective construction period is long are aimed to be solved by the method. The method comprises the following steps that an arch-shaped supporting system is machined according to the size of a main body structure; a wooden box is embedded in the position where a foundation beam is located when the concrete construction of the main body is constructed, cross beam brackets are inserted after a template and the |
---|