Regional hydropower peak regulation limit output estimation optimization method and system
The invention discloses a regional hydropower peak regulation limit output estimation optimization method comprising the implementation steps that the limit output total control quantity A of the target region and the basic information of all the hydropower station units are inputted; three rounds o...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a regional hydropower peak regulation limit output estimation optimization method comprising the implementation steps that the limit output total control quantity A of the target region and the basic information of all the hydropower station units are inputted; three rounds of scheduling is performed so that three rounds of scheduling output Ji of any hydropower station unit i is obtained and the total limit output quantity Xi is obtained through summation; the deviation degree Ri of any hydropower station unit i is calculated and the total limit output quantity Xi and/or the limit output starting time is corrected; and the final total limit output quantity of the hydropower station unit and the limit output starting time are issued to each hydropower station unit so as to form a limit output operation instruction. The output of all the hydropower stations can be allocated with reference to strict implementation of the relevant provisions of "openness, fairnessand justice" when water a |
---|