Method for controlling track before while-drilling geosteering target-entering of shale gas horizontal well
The invention relates to a method for controlling a track before while-drilling geosteering target-entering of a shale gas horizontal well. The method for controlling the track before while-drilling geosteering target-entering of the shale gas horizontal well comprises the following steps that geolo...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to a method for controlling a track before while-drilling geosteering target-entering of a shale gas horizontal well. The method for controlling the track before while-drilling geosteering target-entering of the shale gas horizontal well comprises the following steps that geological data of a standard well, a drilled pilot well, an adjacent well in the area of a to-be-guidedhorizontal well are collected, a drilling program of the to-be-guided well and real-time data of the to-be-guided well are collected, and a guide standard well and a reference well are defined according to the data; a guiding intervention point is defined, and a guide intermediate point is defined; the guide intervention point is controlled to the guide intermediate point; by comparing the data ofthe to-be-guided well and the standard well and the reference well, geosteering marker beds are divided, and the position of a drill bit and the formation dip angle are judged; and according to the vertical depth and thicknes |
---|