Optimized construction method for double-arc tunnel
The invention discloses an optimized construction method for a double-arc tunnel. The optimized construction method for the double-arc tunnel comprises the following steps that temporary support is carried out after a middle pilot tunnel is mechanically excavated by a benching tunnelling method; a s...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses an optimized construction method for a double-arc tunnel. The optimized construction method for the double-arc tunnel comprises the following steps that temporary support is carried out after a middle pilot tunnel is mechanically excavated by a benching tunnelling method; a structural steel arc frame is installed on the side, close to a first cave, of the middle pilot tunnel, construction of a hanging net, connecting bars, anchor rods and sprayed concrete is carried out, and a primary support structure is formed by installing the structural steel arc frame, the hangingnet and sprayed concrete construction; plain concrete is backfilled integrally on the side, close to a back cave, of the middle pilot tunnel; the first cave is mechanically excavated by the benching tunnelling method, and a primary support is closed to form a ring; and a back cave is mechanically excavated by the benching tunnelling method, and the primary support is closed to form a ring. The optimized construction metho |
---|