Method for mounting long-span arch bridge tie bars

The invention discloses a method for mounting long-span arch bridge tie bars and relates to the field of long-span bridge construction. The method comprises the steps that two main ropes are arrangedon a first buckle tower and a second buckle tower which are adjacent to each other, one end of either...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MAO WEIQI, TU MANMING, HE NAI, YUE WANYOU, ZOU GUAN, ZHU HONG, LI FANGFENG, MA TAO, HAN JINGDONG, DU FENG, XIE SHOUJIE, LIU CUIYUN, ZHANG XIAOCHUAN, DAI HAO, HUANG GEN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a method for mounting long-span arch bridge tie bars and relates to the field of long-span bridge construction. The method comprises the steps that two main ropes are arrangedon a first buckle tower and a second buckle tower which are adjacent to each other, one end of either vertical temporary support is arranged on an arch rib, and the other end of either vertical temporary support is temporarily anchored nearby a pier of the first buckle tower. Multiple temporary slings are arranged at intervals and connected into an entirety in series by using connection ropes, thetie bars are connected with pulling cables, the pulling cables are used for pulling the tie bars, and the tie bars are placed on all the temporary slings in sequence. The tie bars are continuously pulled till the two vertical temporary supports can be connected with set portions on the tie bars, and one temporarily-anchored end of either vertical temporary support is disassembled and connected with the corresponding tie b