Four-electricity facility positioning optimization method and apparatus based on BIM technology

The present invention relates to a four-electricity facility positioning optimization method and apparatus based on the BIM technology. The method comprises: acquiring three-dimensional BIM drawings of a four-electricity facility, and adding attribute information tags for a BIM in the three-dimensio...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: XU MUGEN, ZHU CHAOPING, ZHENG YUNSHUI, BAI XUE, WANG XIANG, ZANG YONGLI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The present invention relates to a four-electricity facility positioning optimization method and apparatus based on the BIM technology. The method comprises: acquiring three-dimensional BIM drawings of a four-electricity facility, and adding attribute information tags for a BIM in the three-dimensional BIM drawings of the four-electricity facility; and optimizing position coordinates of the BIM inthe three-dimensional BIM drawings of the four-electricity facility according to the attribute information tags. According to the technical scheme provided by the present invention, information annotation is carried out on the BIM of the four-electricity facility, and accurate positioning is carried out on the four-electricity facility by using the BIM model of each four-electricity facility. 本发明涉及种基于BIM技术的四电设施定位优化方法及装置,所述方法包括:获取四电设施的BIM三维图纸,并对四电设施的BIM三维图纸中的BIM模型添加属性信息标签;根据所述属性信息标签优化所述四电设施的BIM三维图纸中的BIM模型的位置坐标;本发明提供的技术方案,对四电设施的BIM模型进行信息标注,并利用各四电设施的BIM模型对四电设施进行精确定位。