Method for launching/constructing bridge using assembly of precast bottom plate and concrete-filled steel tube truss girder
The present invention relates to a method for launching/constructing a bridge using an assembly of a precast bottom plate and a concrete-filled steel tube truss girder, wherein a CFT truss girder anda precast bottom plate are provisionally assembled, thereby forming a segment, and then a plurality o...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The present invention relates to a method for launching/constructing a bridge using an assembly of a precast bottom plate and a concrete-filled steel tube truss girder, wherein a CFT truss girder anda precast bottom plate are provisionally assembled, thereby forming a segment, and then a plurality of segments are successively launched, thereby constructing a bridge.
本发明涉及种使用预制底板和钢管混凝土桁架梁的组件来顶推/建造桥梁的方法,其中,临时组装CFT桁架梁和预制底板,从而形成分段,然后连续地顶推多个分段从而建造桥梁。 |
---|