New energy access broadband stability multi-level early-warning method of integrated multi-source information

The invention relates to a new energy access broadband stability multi-level early-warning method of integrated multi-source information. Subsynchronous oscillation signals of the key substation, the new energy power station and the traditional thermal power generating unit of a regional power grid...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHAN QINGCAI, CHANG FUJIE, WANG YINGYING, LIAO QUANFEI, WANG QING, BAI SHIBIN, ZHONG HAILIANG, SHI BONIAN, LI QIAN, ZOU JILIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to a new energy access broadband stability multi-level early-warning method of integrated multi-source information. Subsynchronous oscillation signals of the key substation, the new energy power station and the traditional thermal power generating unit of a regional power grid are stationed and monitored at first; broadband 10-90 Hz interharmonic current, voltage and power of the regional power grid and the torsional vibration data of the thermal power generating unit are obtained; and, due to analysis of the interharmonic current, the voltage and the power data, different early-warning levels are designated according to the region oscillation characteristics and the propagation range of the interharmonic in the system. The new energy access broadband stability multi-level early-warning method of the integrated multi-source information disclosed by the invention is used in a WAMS-based subsynchronous monitoring early-warning master station; due to setting of different hierarchical early-