GFRP anti-floating design method for water area drilling-blasting tunnel crossing pipeline

The invention relates to a GFRP anti-floating design method for a water area drilling-blasting tunnel crossing pipeline. The method comprises the steps that a linear meter floating design load q of the pipeline is calculated according to the full-water operating condition of the water area drilling-...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHENG MENGPENG, TENG AIJUN, WU WEN, WANG JIAN, RU ZHIMIN, LU JIANG, WANG HONG, GENG XIAOMEI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to a GFRP anti-floating design method for a water area drilling-blasting tunnel crossing pipeline. The method comprises the steps that a linear meter floating design load q of the pipeline is calculated according to the full-water operating condition of the water area drilling-blasting tunnel crossing pipeline; a pipeline span L is determined according to pipeline material characteristics, conveying medium characteristics and pipeline operating environment conditions; an anti-floating design load Q of an anti-floating anchoring part is determined; the tension NL of a single GFRP anchoring screw, the number n of GFRP anchoring screws and the nominal outside diameter d of each GFRP anchoring screw are determined; and the length B of a pipe clamp, the thickness b of the pipe clamp and the thickness of a pipe clamp bottom plate are determined. A corrosion-free GFRP anti-floating design scheme is proposed for the water area drilling-blasting tunnel crossing pipeline in a pipeline project, and