Anti-sedimentation inspection well replacement process
An anti-sedimentation inspection well replacement process is characterized by including the following steps that firstly, an anti-sedimentation concrete cover plate (1) is prefabricated, wherein the anti-sedimentation concrete cover plate (1) is of a reinforced concrete structure; and secondly, road...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | An anti-sedimentation inspection well replacement process is characterized by including the following steps that firstly, an anti-sedimentation concrete cover plate (1) is prefabricated, wherein the anti-sedimentation concrete cover plate (1) is of a reinforced concrete structure; and secondly, road cutting is conducted, wherein road cutting is conducted with a well chamber as the center according to the rule that the length of each side of the anti-sedimentation concrete cover plate (1) is increased by 200 mm, an existing well lid frame is removed, and chiseling is conducted on the periphery. The anti-sedimentation inspection well replacement process is easy to construct, time is saved, operation is convenient, the influence on traffic flow is small, and the anti-sedimentation inspection well replacement process can be suitable for old well lid replacement of vast urban and rural areas.
种防沉降检查井换装工艺,其特征是包括以下步骤:步骤1)预制防沉降混凝土盖板(1),防沉降混凝土盖板(1)为钢筋混凝土结构;步骤2)路面切割:以井室为中心,按照防沉降混凝土盖板(1)的大小每边增加200mm的长度进行切割路面,去除原有的井盖框,对四 |
---|