Studding recovery method for reconstructing covering layer through dead zone wastefill and top surrounding rock spallation collaboratively

Provided is a studding recovery method for reconstructing a covering layer through dead zone wastefill and top surrounding rock spallation collaboratively. The method comprises the specific steps that after waste rock is exploited out from a chamber and a top column through an open-stope method, a g...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHEN DEYAN, PAN GUIHAI, CHEN QINGFA, HU HUARUI, YIN TINGCHANG, JIANG TENGLONG, ZHANG SHAOGUO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Provided is a studding recovery method for reconstructing a covering layer through dead zone wastefill and top surrounding rock spallation collaboratively. The method comprises the specific steps that after waste rock is exploited out from a chamber and a top column through an open-stope method, a goaf is filled with the waste rock to reach a certain height, surrounding rock at the top of a studding is collapsed off once, and the studding covering layer is reconstructed collaboratively; the studding is divided into a plurality of layers, and a drilling drift is tunneled in the center of the bottom of the layers; an end non-through cutting groove is formed in the tail end of the drilling drift through a cutting courtyard slot broaching method; the cutting groove serves as the ore breaking free face, and the studding is subjected to sequential top-to-bottom interlamination advance and in-layers retreating type recovery; and broken ore is shoveled to a winze through a scooptram and is conveyed to the surface of