Diesel hammer immersed tube carrier pile construction method
The invention discloses a diesel hammer immersed tube carrier pile construction method. The method comprises the steps of piling, manufacturing and placement of a steel reinforcement cage, concrete spouting, pipe drawing for pile forming and the like. The construction speed is high, and quality is g...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a diesel hammer immersed tube carrier pile construction method. The method comprises the steps of piling, manufacturing and placement of a steel reinforcement cage, concrete spouting, pipe drawing for pile forming and the like. The construction speed is high, and quality is good.
本发明公开了种柴油锤沉管载体桩施工方法,包括打桩、钢筋笼制作安放、混凝土灌注拔管成桩等步骤。本发明施工速度快、质量好。 |
---|