COMBINED CYCLE PLANT AND PLANT BUILDING THEREOF

A plant building (100) is provided with: a building main body (150) laid out along an alignment direction (Dr) in which a plurality of single-shaft combined units (1) are aligned, the building main body (150) having a roof (151) for covering the tops of the plurality of single-shaft combined units (...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: ONISHI TSUGUSHI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A plant building (100) is provided with: a building main body (150) laid out along an alignment direction (Dr) in which a plurality of single-shaft combined units (1) are aligned, the building main body (150) having a roof (151) for covering the tops of the plurality of single-shaft combined units (1); a first ceiling crane (110) arranged inside the building main body (150), the first ceiling crane (110) having a girder (111) capable of traveling in the alignment direction (Dr) through an area that extends above gas turbines (30) in the plurality of single-shaft combined units (1); and a second ceiling crane (120) arranged inside the building main body (150), the second ceiling crane (120) having a girder (121) capable of traveling in the alignment direction (Dr) through an area that extends above steam turbines (70) in the plurality of single-shaft combined units (1). 机组厂房(100)具备:厂房主体(150),其具有在多个单轴型联合单元(1)排列的排列方向(Dr)上成排且覆盖多个单轴型联合单元(1)的上方的房顶(151);第桥式起重机(110),其配置在厂房主体(150)内,且具有能够在包括多个单轴型联合单元(1)中的各燃气涡轮(30)的上方在内