Crown beam foundation trench upright construction and cover-excavation method station combination structural system and construction method

The invention relates to a crown beam foundation trench upright construction and cover-excavation method station combination structural system and a construction method. A traditional cover-excavation method construction method has multiple defects. The system comprises a retaining pile, a crown bea...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG LEI, DAI ZHIREN, ZHANG XIONGXIONG, WANG PENG, MAO NIANHUA, WANG HONGBEI, QIN YUJUN, YANG ZIGANG, WANG BO, ZHANG YUBIN, DU YU, LI RUOYONG, GAO XUANTAO, WANG LIXIN, KANG HUA
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to a crown beam foundation trench upright construction and cover-excavation method station combination structural system and a construction method. A traditional cover-excavation method construction method has multiple defects. The system comprises a retaining pile, a crown beam, a semicircular pile, temporary stand columns and a cover-excavation station top plate; the crown beam is located on the top of the retaining pile, the top of the crown beam is provided with the semicircular pile, and the cover-excavation station top plate is built at the position, located on the top of the crown beam, of the inner side of the semicircular pile; the lower portion of the cover-excavation station top plate is supported by the vertical temporary stand columns, and the inner side of the retaining pile is supported by the horizontal temporary stand columns; and the phenomenon that the retaining pile participates in stress is fully utilized, road loads transmitted down by the cover-excavation top plate