Hoisting technique of steel arch bridge member

The invention relates to a hoisting technique of a steel arch bridge member. The technique is performed through the steel arch bridge member, hoisting clamping apparatuses and truss lifting hooks; one side of the steel arch bridge member is selected to be hoisted; a space of the size corresponding t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Xiong Chunyan, Shu Lianji
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention relates to a hoisting technique of a steel arch bridge member. The technique is performed through the steel arch bridge member, hoisting clamping apparatuses and truss lifting hooks; one side of the steel arch bridge member is selected to be hoisted; a space of the size corresponding to the thickness of flange plates of I-steel of the steel arch bridge is reserved on the hoisting clamping apparatuses; the two hoisting clamping apparatuses are symmetrically placed at positions of the flange plates on the same side of the I-steel of the steel arch bridge member; the hoisting clamping apparatuses are operated to clamp the flange plates of the I-steel of the steel arch bridge member; the steel arch bridge member is vertically placed; one ends of the hoisting clamping apparatus face upward vertically; the truss lifting hooks are connected with the hoisting clamping apparatuses; and a truss is operated, so that the hoisting transportation of the steel arch bridge member is realized. The steel arch bri