Method for calculating side displacement of arc-shaped underground continuous wall
Provided is a method for calculating side displacement of an arc-shaped underground continuous wall. The method comprises the steps that the arc-shaped underground continuous wall is simplified as a cylindrical shell, a curvilinear coordinate system is established, the relationship between surface s...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Provided is a method for calculating side displacement of an arc-shaped underground continuous wall. The method comprises the steps that the arc-shaped underground continuous wall is simplified as a cylindrical shell, a curvilinear coordinate system is established, the relationship between surface strain in the arc-shaped underground continuous wall and the displacement is established according to a classical shell theory, the relationship between stress of any point of the arc-shaped underground continuous wall and the displacement and a balance differential equation of any infinitesimal in the arc-shaped underground continuous wall are determined according to the Hooke's law, a balance differential equation of the arc-shaped underground continuous wall is deduced, and therefore the side displacement of the arc-shaped underground continuous wall is determined according to boundary conditions of corresponding working conditions.
种计算弧形地连墙侧位移的方法,所述方法通过将弧形地连墙简化为圆柱壳,建立曲线坐标系,根据经典壳体理论,建立弧形地连墙中面应变与位移之间的关系、根据胡克定律确定弧形 |
---|