Hoisting construction method for steel column in construction of protective support for existing overcrossing railway
The invention discloses a hoisting construction method for a steel column in construction of a protective support for an existing overcrossing railway. A single steel wire rope is adopted to bind the steel column in an opposite buckling manner through snap rings, and then the steel column is hoisted...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a hoisting construction method for a steel column in construction of a protective support for an existing overcrossing railway. A single steel wire rope is adopted to bind the steel column in an opposite buckling manner through snap rings, and then the steel column is hoisted by a crane. When the steel wire rope is adopted for binding, two ends of the steel wire rope are arranged from two sides of the top of a flange on the steel column to the body of the steel column, then one end A of the steel wire rope winds the steel column from the front of the steel column to the back, the other end B of the steel wire rope winds the steel column from the back of the steel column to the front, the end A of the steel wire rope is connected with the body of the steel wire rope winding from the back to the front through one snap ring to form a slip knot, and the end B of the steel wire rope is connected with the body of the steel wire rope winding from the front to the back through the other snap r |
---|