High-efficiency maintenance device for oil pipe

The invention discloses a high-efficiency maintenance device for an oil pipe. The high-efficiency maintenance device for the oil pipe comprises a booster pump, a hose and a spray head, a flushing spray orifice set is arranged on the front side portion of the spray head, a rear thrust spray orifice s...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WEI LONGGUI, REN SONGTAO, XU FEI, ZHAO ZHICHAO, FENG XUESONG, YANG JUNLONG, MEI MINGYANG, WANG ERJUN, LI ZHUJUN, YAN BANGCHUAN, DUAN ZEHUI, LIAO KUN, LI JIANYI, MA LEI, HUANG LIANG
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a high-efficiency maintenance device for an oil pipe. The high-efficiency maintenance device for the oil pipe comprises a booster pump, a hose and a spray head, a flushing spray orifice set is arranged on the front side portion of the spray head, a rear thrust spray orifice set is arranged on the rear side portion of the spray head, the booster pump compresses water, the compressed water flows to the spray head through the hose, the compressed water is sprayed through the flushing spray orifice set of the spray head to the oblique front portion to flush the inner wall of the maintained oil pipe, the compressed water is further sprayed through the rear thrust spray orifice set to the oblique rear portion to the inner wall of the maintained oil pipe to drive the spray head to move forward in the maintained oil pipe. The flushing spray orifice set is composed of four spray orifices with an inclined angle of 45 degrees, and the rear thrust spray orifice set is composed of six spray orifices with an inclined angle of 60 degrees. By means of the high-efficiency maintenance device for the oil pipe, high-efficiency maintenance can be rapidly conducted on a high-temperature, high-pressure and air-tightness oil pipe pulled out on site, and the requirements for making the oil pipe placed into a well again can be met; on-site operation time is saved, the workload of on-site staff is reduced, and therefore it is guaranteed that follow-up operations can be completed smoothly.