Integrated oilfield decision making system and method

A method for controlling operations during construction of a subsurface wellbore includes measuring a plurality of wellbore construction parameters. At least one wellbore state parameter is calculated from the wellbore construction parameters in a computer. A plurality of users to communicate with t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HILDEBRAND GINGER, BRANNIGAN JAMES C, JOHNSTON LUCIAN
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A method for controlling operations during construction of a subsurface wellbore includes measuring a plurality of wellbore construction parameters. At least one wellbore state parameter is calculated from the wellbore construction parameters in a computer. A plurality of users to communicate with the computer enable to access at least one of the measured wellbore construction parameters and the at least one wellbore state parameter. Depending on assigned tasks, such user may receive task specific wellbore construction parameters and selected wellbore state parameters for display when a requested is communicated to the computer.