Cover plate of drainage ditch in tunnel and manufacturing method of cover plate
The invention relates to the technical field of cover plates, in particular to a cover plate of a drainage ditch in a tunnel and a manufacturing method of the cover plate. The thickness of the cover plate is 2-3 cm, and one or more ventilation holes penetrating through the upper surface and the lowe...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to the technical field of cover plates, in particular to a cover plate of a drainage ditch in a tunnel and a manufacturing method of the cover plate. The thickness of the cover plate is 2-3 cm, and one or more ventilation holes penetrating through the upper surface and the lower surface of the cover plate are formed. The cover plate of the drainage ditch in the tunnel is obtained through material preparing, stirring, vibrating forming, initial maintaining and final maintaining. The thickness of the cover plate is reduced to 2-3 cm from 6 cm in the prior art and becomes smaller, the use amount of concrete is obviously reduced, and the overall weight becomes lower. However, a high-speed train generates air negative pressure when running in the tunnel, the cover plate with the lowered weight is likely to be sucked away, so that the ventilation holes penetrating through the upper surface and the lower surface of the cover plate are formed in the cover plate for the situation, the air inside and outside the drainage ditch can be communicated, and the air negative pressure is effectively reduced. |
---|