Hanging-basket and bent-cap-support matched integral construction method for side span linear segment of high-pier continuous rigid frame bridge

The invention discloses a hanging-basket and bent-cap-support matched integral construction method for a side span linear segment of a high-pier continuous rigid frame bridge. Reinforcing steel bars are bound at a time; pouring is carried out twice; in other words, a section is formed in a pouring m...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DING QINGPEI, LONG PEIQIN, HUANG BIN, WANG XIEJUN, LIU XINWEI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a hanging-basket and bent-cap-support matched integral construction method for a side span linear segment of a high-pier continuous rigid frame bridge. Reinforcing steel bars are bound at a time; pouring is carried out twice; in other words, a section is formed in a pouring mode through a hanging basket in the first time of pouring, and a left solid section is formed in a pouring mode in the second time of pouring. Most of the solid section formed in the second time of pouring is located on a bent cap, and a fraction of the solid section is located on the hanging basket. The hanging-basket and bent-cap-support matched integral construction method has the advantages that the construction procedure can be simplified, the construction period can be saved, and the construction cost can be saved.