Hanging-basket and bent-cap-support matched integral construction method for side span linear segment of high-pier continuous rigid frame bridge
The invention discloses a hanging-basket and bent-cap-support matched integral construction method for a side span linear segment of a high-pier continuous rigid frame bridge. Reinforcing steel bars are bound at a time; pouring is carried out twice; in other words, a section is formed in a pouring m...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a hanging-basket and bent-cap-support matched integral construction method for a side span linear segment of a high-pier continuous rigid frame bridge. Reinforcing steel bars are bound at a time; pouring is carried out twice; in other words, a section is formed in a pouring mode through a hanging basket in the first time of pouring, and a left solid section is formed in a pouring mode in the second time of pouring. Most of the solid section formed in the second time of pouring is located on a bent cap, and a fraction of the solid section is located on the hanging basket. The hanging-basket and bent-cap-support matched integral construction method has the advantages that the construction procedure can be simplified, the construction period can be saved, and the construction cost can be saved. |
---|