Water pump base fastening device of integrated pump station
The invention provides a water pump base fastening device of an integrated pump station. The integrated pump station comprises a pump station cylinder installed in a foundation pit. A submerged electric pump is installed on the bottom face inside the pump station cylinder and is fixed to and acts on...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention provides a water pump base fastening device of an integrated pump station. The integrated pump station comprises a pump station cylinder installed in a foundation pit. A submerged electric pump is installed on the bottom face inside the pump station cylinder and is fixed to and acts on a bottom plate of the pump station cylinder through a water pump base by means of bolts. The water pump base is attached to the bottom plate of the pump station cylinder. After long bolts penetrate through the water pump base and the bottom plate of the pump station cylinder to connect the water pump base with the bottom plate of the pump station cylinder, the lower side end of the water pump base and the upper side end of the bottom plate of the pump station cylinder are clamped and fixedly connected through gaskets and nuts. The lower ends of the long bolts extend into a base which is formed through twice concrete pouring in the foundation pit below the pump station pump. The long bolts and the bottom plate of the pump station cylinder are sealed through waterproof materials and pressed through the gaskets at the lower side end. The lower ends of the long bolts are bent and are connected with transverse and longitudinal plane round steel and all foundation bolts in series, and then the lower ends of the long bolts, the transverse and longitudinal plane round steel and the foundation bolts are welded into an integrated stainless steel net which is arranged in a twice concrete base formed in the ground foundation pit after twice concrete pouring is conducted and then hardening is conducted. |
---|