Method for predicting maximum load of district based on tea making yield of district

The invention provides a method for predicting the maximum load of a district based on the tea making yield of the district. The method comprises the following steps that 1, the tea making yield of the tea making district is surveyed, next step is conducted until it is determined that yield data are...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: JIANG MINGSHUI, WU SIMOU, CAI XIUWEN
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention provides a method for predicting the maximum load of a district based on the tea making yield of the district. The method comprises the following steps that 1, the tea making yield of the tea making district is surveyed, next step is conducted until it is determined that yield data are correct, and otherwise the data are collected again; 2, the yield data are substituted into the model function f(x)=a*x^b+c; wherein, a=0.00507, b=1.17, c=16.97, x is tea making yield of the district, and f(x) is the maximum load of the district. By the adoption of the method, the maximum load of the tea making district can be directly predicted, a user can more conveniently manage the load, the accuracy of load prediction is improved, and the safety power supply to the Anxi region during tea making is guaranteed.