Construction method for transmission line project material transport by prefabricated cableway
The invention relates to a construction method for transmission line project material transport by a prefabricated cableway. The construction method includes the steps of S01, supporting pillar mounting, S02, pulling cable erection and driving device mounting, S03, driving device mounting, S04, carr...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention relates to a construction method for transmission line project material transport by a prefabricated cableway. The construction method includes the steps of S01, supporting pillar mounting, S02, pulling cable erection and driving device mounting, S03, driving device mounting, S04, carrying cable erection, S05, traveling trolley selection, and S06, cableway operation test. The construction method has the advantages of applicability to material transport in mountainous areas and hilly grounds, high applicability, simplicity in application, convenience in maintenance, high working efficiency, little environmental destruction and the like. |
---|