Method for temporarily changing power grid topological structure
The invention discloses a method for temporarily changing a power grid topological structure. The method includes the steps that firstly, when temporal head detaching and head lapping are conducted on a transmission line and the connecting relation between a power grid topological structure and an e...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The invention discloses a method for temporarily changing a power grid topological structure. The method includes the steps that firstly, when temporal head detaching and head lapping are conducted on a transmission line and the connecting relation between a power grid topological structure and an element is changed, a broken line board is used as a mark symbol, and a broken line mark is displayed on a corresponding circuit; secondly, the mark position with the hung broken line board serves as a kind node, and a kind node database is established; finally, a conflict resolution strategy is introduced in. The method solves the problem that a graph dispatching operation system changes the connecting logic of the power grid structure and the element due to temporary work in practical work, so that an operation order system cannot work normally, and therefore the functions of the graph operation order system are improved. |
---|