Method for installing kiln tail steel structure framework on large-sized cement clinker production line

The invention discloses a method for installing a kiln tail steel structure framework on a large-sized cement clinker production line. The method comprises the following steps of: (1) installing a framework base; (2) installing a vertical column base; (3) installing vertical columns; (4) installing...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: LIU RENYUE
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The invention discloses a method for installing a kiln tail steel structure framework on a large-sized cement clinker production line. The method comprises the following steps of: (1) installing a framework base; (2) installing a vertical column base; (3) installing vertical columns; (4) installing transverse beams; (5) installing diagonal bracings; (6) grouting the vertical columns; (7) installing a second layer framework; and (8) installing a third layer and more layers of frameworks: installing a third layer to more layers in sequence according to the step (7) to form a required kiln tail steel structure framework finally. The installing method has the advantages of easiness, firmness, saving in materials, reduction in cost, and capability of guaranteeing both quality and quantity.